BISHOY MANKRYOUS

Digital project controls portfolio

Software built on live contracts

Every platform here started as a problem I met while administering a real construction contract: quantities that disagreed with the programme, delay that nobody could prove, and claims assembled by hand. I designed and built each one myself. Figures come from the working software, and estimates are marked as estimates.

RoleSenior Contracts & Commercial Professional
DisciplineCivil Engineer, PMP
Experience13+ years: Australia, UAE, Botswana, Egypt
BasedBrisbane, QLD
SheetPlatformWhat it doesDemo
01 The Chimney The commercial side of a major underground mining contract, with contract-grounded letter drafting 1:39 video
02 Narmer Estimating and commercial control: from first measurement to submitted price, subcontract award and monthly cost Video
03 Chronos Planning, quantities and forensic delay analysis for buildings, roads and bridges 2:12 video
04 Kemet Drawings, inspections and sign-off in one live record for construction and mining 2:29 video
05 RosterHub FIFO workforce rostering, compliance and client billing, with a checked AI analyst Video
Sheet 01 · Commercial & contract administration

The Chimney

One workspace that runs the commercial side of a major underground mining contract and drafts the contractual letters, grounded in the contract itself.

Sector
Underground mining
Built
Solo, beside a full-time role
At the face
Works offline, syncs later
AI
Nine services, with fallback
Demo contract
AUD 1.54B, fictional
Delivery
Web application

Correspondence, claims, variations, delays, payments and progress in one place, so no notice ever slips past its time bar.

Showreel · 1 min 39 s · invented data on a fictional projectWatch on YouTube
22modules covering the whole commercial function
769contract clauses indexed, so every citation points at real wording
114details recorded per delay event, enough to substantiate a claim
3,091automatic checks run on every change
20–30 ha month returned to commercial work (estimate)
A · The problem

A dozen places, one position

On a large underground contract the commercial position is scattered: correspondence in one spreadsheet, claims in another, variations in a third, delays in a notebook on site, payment certificates on a shared drive, and the contract as a PDF nobody has time to re-read.

Deadlines nobody can see

Give notice within 14 or 28 days or the entitlement is gone. When the dates live in a spreadsheet nobody opens on a Friday, the bar passes quietly.

Letters that miss the clause

Re-read the contract, find the sub-clause, check earlier letters, draft carefully. Half a day, and a wrong clause is worse than no letter.

Delays recorded too late

By the time a stopped heading reaches the commercial team, the times, the standing machines and the cause are gone. The claim cannot be substantiated.

"Where do we stand?"

Asked at every monthly review, and answering it takes a day of cross-checking.

One notice served inside its time bar can be the difference between an entitlement worth hundreds of thousands and one worth nothing. Catching a single missed notice a year pays for the whole system many times over.

B · On screen

The working system

C · Capabilities

What it does

  • 01

    Where do we stand, on one screen

    Money certified against contract value, claims in play, variations pending, time against value earned, and the open actions counted on each side.

  • 02

    Letters grounded in the contract

    Say or dictate what happened. It finds the clauses that apply, checks earlier letters and drafts in your tone. Each cited clause opens with the relied-on wording highlighted.

  • 03

    Nothing falls past a deadline

    Every notice, submission and determination carries its contractual deadline and shows on time, due or late, through to dispute stages.

  • 04

    Delays captured at the face

    On a phone at the stopped heading: time off and on, what was lost, a photograph, a line of description, and the other party's signature.

  • 05

    Signatures that stand up later

    Signers get private links by email. Each signature carries the time, the device and a fingerprint of the exact document signed.

  • 06

    Search by meaning

    Describe what you half-remember and it finds the letter by meaning, then shows the whole chain that letter belongs to.

  • 07

    Progress you can read

    Development and cost month by month against programme, split by ground support regime, with cumulative curves that show a shortfall as a shape.

  • 08

    The mine in 3D

    The underground network built month by month, filterable by area, level and activity, with design revisions compared on screen.

D · Scenario

The water main on 740

Thursday afternoon. The service water main to the 740 level fails and three headings stop: two jumbos and a charge-up crew standing.

  1. Thu pm
    Recorded at the heading

    The superintendent logs the time it went off, ticks what was lost, photographs the line and writes two sentences on his phone.

  2. At the face
    Signed by the client's representative

    The phone is handed over and signed there and then.

  3. Fri am
    Notice deadline counting down

    The event is already a substantiated delay record: hours lost, plant and crew standing, cause, signatures, photograph.

  4. Fri
    Notice drafted from three sentences

    It cites the sub-clause that puts service water on the client and attaches the signed record. One click checks the clause.

  5. Sent
    Inside the time bar

    A sentence adjusted, and the notice goes out on time.

  6. +6 months
    The claim is contested

    Record, notice, response and determination sit on one screen, every date and signature intact.

E · Impact

The difference it makes

What changesBeforeWith The Chimney
Drafting a grounded contractual letter2 to 4 hours20 to 30 minutes, with clause search and first draft done
Monthly commercial reportAbout a dayAbout an hour, figures already current
Capturing a delay eventOften never, or days late and thinMinutes, at the face, signed
Answering "where do we stand?"Half a day of cross-checkingImmediate, one screen
Notices missed past the time barA live risk on every contractVisible and counted down

Time

Drafting and reporting alone return around 20 to 30 hours a month to chasing entitlement, negotiating and thinking.

Entitlement protected

Deadlines are visible and counted down, so a strong claim is never lost to a missed notice.

Evidence that holds

114 details per delay event, signed at the face, turn an asserted claim into a substantiated one.

Built to keep working

Nine AI services with fallback and 3,091 automatic checks, so a fix in one place cannot quietly break another.

Time figures are estimates reasoned from how the work was done before. The live tool runs on a real contract; every figure, name, reference and the mine model shown here are replaced with invented data on a fictional project.

Sheet 02 · Estimating & cost control

Narmer

Cost estimating and commercial control for underground mining and heavy civil work, on one set of numbers from first measurement to final account.

Sectors
Underground · Heavy civil
Built
Solo, end to end
Risk
10,000-run simulation
Quotes
Read from supplier workbooks
Demo estimate
USD 188.6M twin decline
After award
Earned value, monthly

Every rate is built from the resources behind it, so any number can be traced back to the work it came from.

Demo video · demonstration estimateWatch on YouTube
188.6MUSD price reconciled to the bill, nothing unexplained
10,000simulated runs set the contingency
13review findings, 5 serious, covering USD 30.3M of exposure
2scope items caught missing from the cheapest bid
~600quote figures not re-keyed on a 200-line package
A · The problem

Estimates that cannot explain themselves

Underground estimating runs on spreadsheets. They are quick to start and fail the same four ways on every job.

Rates nobody can explain

A rate came from a crew, a machine, an explosive and a consumable, but only the number was typed. Six weeks later it is rebuilt from memory.

One change, hundreds of cells

Fuel or wages move mid-tender and every dependent rate is fixed by hand. Some are missed, and the sheet still adds up.

Quotes ranked on the wrong number

Bids are re-keyed and ranked on their totals, which rewards whoever left the most out, because exclusions are written as prose.

Estimate dropped at award

Cost control restarts in a new spreadsheet, so nobody can say if the job is ahead or behind on what was priced.

A mispriced package, an unsupportable claim or an award to the wrong subcontractor costs far more than the estimating hours ever did.

B · On screen

The working system

C · Capabilities

What it does

  • 01

    A bill as deep as the work

    Section, item, build-up and the labour, plant, material and subcontract lines beneath. One slider turns the working estimate into a board summary.

  • 02

    Rates built from a shared library

    Jumbos, crews, explosives and consumables feed every rate. Change a wage once and every rate built on it moves.

  • 03

    Cost to price in named steps

    Time-related and fixed overheads, compounded escalation, and profit shown as mark-up and as margin, each step with the figure it added.

  • 04

    Risk priced, not guessed

    Best, likely and worst case on each line, 10,000 runs, and the contingency the simulation actually asks for.

  • 05

    Subcontract bids on equal scope

    Supplier workbooks read automatically. Every exclusion priced back in, or flagged as something nobody will price.

  • 06

    Reviewed before the client sees it

    Checks for scope measured but not priced, lump sums with no build-up and rates without evidence, each naming the line and the money exposed.

  • 07

    Answers that link to their source

    Ask for the biggest cost drivers or the contingency logic, and every figure in the answer clicks back to its row.

  • 08

    Cost control after award

    Budget, earned value, actual cost, performance index and forecast at completion, monthly, on the structure the estimate was built on.

D · Scenario

Eleven days to tender close

The ground-support package for a decline-development tender comes back from three subcontractors. One bidder is USD 2.3M cheaper, and the commercial manager is asked why there is anything to discuss.

  1. Load
    Three workbooks read from their cells

    Priced schedules lined up against the same scope, nothing re-keyed.

  2. Compare
    Two items missing from the cheap bid

    Cable bolting to intersections and straps to high-stress zones are in the other offers and simply absent here, with no value against them.

  3. Price back
    Exclusions priced from competitors

    The cheap offer is marked as covering half the common scope and refused a rank. An unpriced exclusion is a cost that arrives after award.

  4. Award
    Dearer on paper, cheapest to accept

    The package goes to a bid with a higher headline and the lowest true cost, a decision a normal comparison sheet could never support.

E · Impact

Measured on the demo estimate

Where the value isWhat the system doesThe number
Subcontract awardPrices every exclusion back in before rankingCheapest headline USD 4.73M was incomplete; best offer cost USD 7.17M to accept
ContingencyCarries what a 10,000-run simulation asks forSimulation asks USD 5.76M at 80%, estimate carries USD 7.45M; a flat 10% would carry USD 14.9M
Errors before issueAutomated review of the estimate's own figures13 findings, 5 serious, USD 30.3M of exposure, each on its line
Re-pricingOne resource library behind every rateA wage or fuel change made once, not chased across 119 priced lines
Price defensibilityEvery step from cost to price namedUSD 121.7M of work to a USD 188.6M price, fully reconciled
After awardThe estimate becomes the cost baselineMonthly variances against the priced structure

Wrong award prevented

No package handed over on an incomplete scope, with the missing items bought later at full price.

Contingency justified

Over nine million of price a flat allowance would carry with nothing behind it, replaced by a figure the simulation supports.

Unpriced scope caught

An estimate is not issued with scope still unpriced or rates without evidence.

One set of numbers

From measurement to price to monthly cost, every figure traces back to the work it came from.

All figures are measured from the demonstration estimate in the system: a USD 188.6M twin-decline access job, 72 measured items, 153 lines.

Sheet 03 · Planning & forensic delay

Chronos

Planning software for construction and heavy civil projects.

Sectors
Buildings · Roads · Bridges
Built
Solo, end to end
Works with
Primavera P6, MS Project
Exports
Excel, P6, MSP
Demo project
21-storey tower
Delivery
Web application

Describe the building. Chronos measures it, builds the programme, watches it go up, and proves what happened when it goes wrong.

Demo · 2 min 12 sWatch on YouTube
1,082measured quantities from a six-line description
1,270programme activities generated, none typed by hand
14schedule-quality checks on every recalculation
5forensic delay methods run at once
38 dextension proved, with AED 2.9m prolongation cost
A · The problem

Four tools, four stories

On a major project, four jobs are done by four people in four tools, and none of them agree.

Quantity surveyor

Measures the building by hand from drawings. On a 21-storey tower that takes two to three weeks, and it starts again whenever the design moves.

Planner

Types the programme into Primavera P6: over a thousand activities, every link and every crew. Several weeks of work, using quantities of their own.

Schedule quality

Rarely checked. The recognised industry checks are sold as a separate product that most teams do not own.

Delay claims

When the job runs late, a claims consultant is hired. Six to twelve weeks later comes an opinion the other side's consultant will dispute.

The measurement, the programme, the progress and the claim become four separate stories about one project, so every dispute turns into an argument about whose spreadsheet is right. Entitlement that cannot be proved does not get paid.

B · On screen

The working system

C · Capabilities

What it does

  • 01

    Describe the building, get the quantities

    Storeys, heights, footprints and uses go in. Out come 1,082 quantities across 24 levels, priced at AED 43.7m over 773 line items, with no manual take-off.

  • 02

    Quantities become a real programme

    1,270 activities, 1,555 logic links, a 405-line work breakdown and 4,422 crew and plant assignments. Change the building and the programme follows.

  • 03

    Three kinds of project

    A tower is a stack of floors, a road is a production line, a bridge is a sequence of gates. Modelled: a 21-storey tower, a 6 km expressway and a six-span viaduct.

  • 04

    Watch it being built

    Pick any date and see the project exactly as it stood that day. One view replaces an hour of explanation to a client or a board.

  • 05

    Automatic quality checks

    Fourteen recognised schedule checks run on every recalculation, scoring 86 with 12 of 14 passing. A built-in reviewer proposes specific fixes and gives the reason for each.

  • 06

    Prove what caused a delay

    Each recorded event is tested against the programme in force on the day it arose, using five internationally recognised forensic methods, with any disagreement reported.

  • 07

    Draft the claim

    Writes the extension-of-time submission in contractual language: summary, works, events, analysis and money.

  • 08

    Works with the industry's tools

    Imports and exports Primavera P6 and Microsoft Project. Quantities go out to Excel and come back checked for tampering.

D · Scenario

Three events, one critical path

Eighteen months into a 21-storey tower, the engineer issues a variation changing the slab edge on levels 2 to 6, after the level 2 formwork is already set out. Two weeks later the tower crane's gearbox fails. In January it rains for a fortnight and pours are suspended. Three events, three different parties at fault, all overlapping on the same critical path.

The planner records each event as it happens. Chronos tests each one against the programme in force on that day and reports that the frame delay pushes completion from 8 August to 1 October 2029: 38 working days of extension and AED 2.9m of prolongation cost. The crane failure is the contractor's own risk and earns nothing. The submission is drafted the same afternoon.

E · Impact

Before and after

TaskBeforeWith Chronos
Measuring a 21-storey tower2 to 3 weeks of a quantity surveyorUnder a second, 1,082 quantities
Building the programme3 to 6 weeks of a plannerGenerated from the same description
Re-measuring after a design changeRepeat the whole exerciseChange the description and everything follows
Schedule quality checkingSeparate specialist product, used rarely14 checks on every recalculation
Forensic delay analysis6 to 12 weeks of a claims consultantSame day, five methods
Drafting an extension-of-time claimWeeks of specialist writingDrafted from the recorded evidence

Time

The measurement and programming on the demonstration project represent roughly five to nine weeks of specialist effort, repeated every time the design changes.

Money protected

With liquidated damages at AED 75,000 a day, 38 days correctly proved removes AED 2.85m of exposure. The 15 days with no entitlement were identified too.

Errors avoided

Quantities, programme, progress and claim all come from one description, so four documents that disagree cannot happen.

Faster decisions

Quality, risk and early warnings recalculate continuously, so a problem shows in the week it appears rather than at the next monthly review.

Before figures are industry norms for work of this scale. Every Chronos figure is measured from the working system.

Sheet 04 · Document control & quality

Kemet

Project control for construction and mining: drawings, inspections and sign-off in one live record.

Sectors
Construction · Mining
Built
Solo, end to end
On site
Any phone, no app
Record
Sealed audit history
Demo project
$418M marine terminal
Delivery
Web application

Kemet raises the inspection from the quality plan, gets it signed on site by both sides, issues the certificate itself, then reads its own record every night to find where the project contradicts itself.

Demo · 2 min 29 sWatch on YouTube
473links between drawings, read from title blocks, none typed
18drawings the project needs and never received, found automatically
1,346inspection stages across 306 elements, raised from the plan
1,003signatures on site across three organisations
~330 hof document control removed from one package
A · The problem

Five places, no single truth

On most packages the information that controls the work lives in five places: the register in a spreadsheet, the drawings in folders, the inspection forms in Word, the correspondence in Outlook and the real status in somebody's head. That costs money in four predictable ways.

Built from a dead drawing

A sheet is superseded on Tuesday; the copy taped to the column is not. Nobody on site can tell a current print from a replaced one.

Inspections retyped, then chased

Find the test plan, copy the checkpoints, type the drawing numbers, email it, then chase a signature for two days. Repeat 570 times on one package.

Nobody knows what is missing

A drawing named on three title blocks but never issued stays invisible until a crew reaches the work face and cannot build.

The monthly report by hand

One to two days of a controller's month, out of date when sent, and no provable record of who held which revision when a dispute arrives.

Building from a superseded sheet is the most expensive routine failure on a project, and it is a paperwork failure rather than a construction one.

B · On screen

The working system

C · Capabilities

What it does

  • 01

    The register builds itself

    Drop in a folder of drawings, CAD or scanned, and Kemet reads number, title, revision, discipline, status and which other drawings each sheet names.

  • 02

    The project, not a spreadsheet

    Areas, structures and systems each hold their drawings, coloured by status. One search takes you from 289 sheets to the twelve that matter.

  • 03

    Drawings you are owed

    Lists every drawing the project depends on and has never received, with the sheets that name it and who to ask.

  • 04

    Quality plan built into the work

    Each element type carries its inspection stages, acceptance criteria and source standard. A request arrives with element, stage, location and checklist already filled in.

  • 05

    Signed on site by both sides

    Each party gets a private link that works on any phone with no app and no login. Walk the work, clear the hold points, write the note, sign.

  • 06

    The certificate issues itself

    When the last signature lands, the certificate is produced, filed and sent to everyone entitled to it, with the reason each person is on the list. Failed deliveries show as failures.

  • 07

    Prints checked by phone

    Every controlled print carries a code. Scanning it shows current, superseded or withdrawn, and every scan of a dead print is logged as evidence.

  • 08

    It reports where it disagrees with itself

    Overnight checks found 176 contradictions in the demonstration package, each showing the records behind it and ranked by what it costs to leave alone.

D · Scenario

Friday afternoon, pile cap P-114

The reinforcement cage for pile cap P-114 is finished and the pour is booked for Monday morning.

  1. Fri pm
    Inspection raised in two minutes

    Checklist, element and location come with the stage. The two attached drawings can only be live sheets from the register.

  2. At the cage
    Consultant signs at the cage

    She works the hold point on cover and spacing with the same checklist open, writes her note and signs.

  3. +1 hour
    Client's representative signs

    Same record, signed an hour later from the site office.

  4. Instantly
    Certificate issued and filed

    Produced, filed against the pile and emailed to everyone entitled. P-114 moves from "reinforcement" to "pour next".

  5. Overnight
    Kemet flags a superseded drawing

    One of the two drawings was replaced two days earlier and is still issued for construction to three people. It goes to the top of Monday's list.

  6. Mon am
    Pour on the right drawing

    The whole exchange is on the record, in order, with time and organisation against every signature.

E · Impact

What it is worth

What it replacesBy handWith KemetOne package
Raising an inspection request~20 min each~2 min~170 h
Issuing and filing the signed copy~15 min eachHappens by itself~140 h
Typing the register from a drawing issue~4 min a sheetUnattended~20 h
Monthly document control report1 to 2 days a monthOn demand, every figure traceable12–24 days/yr

Errors caught

48 sheets issued for construction while the register still called them draft or in review. 18 drawings never requested. 53 held elements in one list.

Money protected

Redoing one pile cap or tank weld costs $20,000 to $150,000. $2.0M of declared cost impact across 23 questions is tracked with drawing, answer and date.

Faster decisions

What to chase today is ranked by what each item is blocking. Sign-off moves from days of chasing to the same afternoon.

Holds up afterwards

Every action goes into a sealed history, so who signed what, when and against which revision is provable years later.

Figures use the demonstration package (289 drawings, 621 revisions, 570 inspections, 306 elements) with conservative hand-processing times. No client data appears anywhere.

Sheet 05 · Workforce & commercial

RosterHub

Rostering, mobilisation and client billing for fly-in fly-out projects, with an AI analyst whose answers are checked.

Sectors
Mining · Construction
Built
Solo, end to end
Workforce
FIFO, day and night
AI
Planner + independent checker
Demo project
~400-person FIFO site
Exports
Excel, live formulas

One system plans who works where and when, keeps them cleared to travel, and bills the client for every day worked, to the cent.

Demo video · fictional company and namesWatch on YouTube
~$45ka month of unbilled days recovered (estimate)
25–40 hsaved each month on the client claim (estimate)
Weeksof warning before a seat on site goes empty
2 AIsone answers, an independent one checks
0changes saved without a person approving them
A · The problem

A roster held together by email

A remote project with several hundred FIFO workers usually runs on disconnected spreadsheets.

The roster

A huge colour-coded sheet, copied, patched and emailed until nobody knows which version is current.

Backfill gaps

Days when a role has no one on site are found by eye, usually when the seat is already empty.

Compliance and travel

Medicals, inductions, tickets and flights sit in other lists. Expiries are missed and people fly in before they are cleared.

The monthly claim

Rebuilt by hand every month. Days of work, with billable days missed, wrong rates and overlaps the client will dispute.

Contract against actual is known only after the month closes, and every management question means hours of filtering. The result is revenue left unbilled and decisions made on numbers nobody fully trusts.

B · On screen

The working system

C · Capabilities

What it does

  • 01

    One live roster for the life of the project

    Rotations such as 14 on / 14 off build themselves. Leave, R&R, travel, training and standby are recorded day by day, and every change is logged and can be undone.

  • 02

    Gaps found before they happen

    Every pair covering a position is checked against each other. Empty days are flagged, better pairings suggested and a roster shift proposed to close the gap.

  • 03

    The client claim builds itself

    Priced by role at contract rates, including night, travel and standby. Checked for overlaps before it goes, then frozen; later roster changes trigger a warning.

  • 04

    Contract against actual, monthly

    People allowed and contract value against what is rostered, billable and costed, with margin and flags such as roles outside the contract.

  • 05

    An AI analyst you can check

    Ask in plain English. It works from every record, shows the table behind the answer, and a second AI checks it before you see it.

  • 06

    A copilot that rehearses first

    Instructions are tried on live data and shown as records and dollars before anything is saved. A person approves, and one click undoes it.

  • 07

    Mobilisation, compliance, travel

    Onboarding from pre-start to mobilised, a ticket matrix of done, pending, expiring and expired, plus the travel manifest, leave and leavers.

  • 08

    Excel out, Excel in

    Every page exports as a real workbook with live formulas and charts. Imports in any layout are recognised and checked before saving.

D · Scenario

The 28th, claim due in three days

A 400-person underground project. The project manager opens RosterHub.

  1. Open
    The claim is already priced

    Role by role at contract rates, including the night shifts and travel days that usually slip through.

  2. Check
    Two overlaps flagged

    The pre-submission check finds two backfill overlaps the client is likely to query.

  3. +2 weeks
    An empty night shift ahead

    The dashboard shows a site supervisor role with nobody on nights in two weeks.

  4. Ask AI
    Expats on site by role

    A checked answer for the client meeting in seconds, with the working shown.

  5. Approve
    Gap closed

    The PM approves the suggested roster shift. The empty seat never happens.

  6. Same pm
    Claim submitted

    Every day actually worked is billed, and nothing the client can easily dispute.

E · Impact

What it is worth

AreaBeforeWith RosterHubEstimated impact
Monthly client claim3 to 5 days of spreadsheet workGenerated, reviewed in half a day25–40 h/month
Unbilled daysMissed night, travel and standby daysEvery rostered day priced correctly~$40–50k/month
Excel reportingRebuilt and retyped monthlyOne click, live formulas5–10 h/month
Disputed claimsOverlaps found by the clientFlagged before submissionFaster payment
Backfill gapsFound on the dayShown weeks ahead with a fixNo empty seats
Margin visibilityKnown after month endEvery month, as it happensFixed in time

Revenue recovered

Assuming 0.5% of about 9,000 person-days a month are missed, roughly 45 days at about $1,000 a day come back each month.

Compliance

Expiring and expired tickets sit on the dashboard, so fewer people are mobilised before they are cleared.

Trusted answers

Management questions answered in seconds from every record, with the working shown and an independent check.

Traceable figures

Every number has an information button and breaks down to the people and days behind it.

Impact figures are estimates for a typical 300 to 400 person FIFO project, each with its stated assumption. Screens use a fictional company with invented names and figures.